Top Suppliers Hydraulic Parts 127v Power Unit - Hydraulic gear pump-HILO PUMP – Guorui
Top Suppliers Hydraulic Parts 127v Power Unit - Hydraulic gear pump-HILO PUMP – Guorui Detail:
Model |
Flow (gpm) 3600r/min |
Pressure (Psi) |
Displacement (Cu.in/r) |
Speed (rpm) |
D (mm) |
|||
Lo |
Hi |
Lo |
Hi |
Inlet
|
Outlet
|
|||
CBT-6.3/2.1 |
8 |
400/900 |
3000 |
0.385 |
0.13 |
3600 |
1 IN PIPE |
1/2 NPT |
CBT-6.3/3.0 |
8.5 |
400/900 |
3000 |
0.385 |
0.183 |
|||
CBT-6.3/3.6 |
9 |
400/900 |
3000 |
0.385 |
0.220 |
|||
CBT-8.8/2.1 |
10 |
400/900 |
3000 |
0.537 |
0.13 |
|||
CBT-8.8/3.0 |
10.5 |
400/900 |
3000 |
0.537 |
0.183 |
|||
CBT-8.8/3.6 |
11 |
400/900 |
3000 |
0.537 |
0.220 |
|||
CBT-8.8/4.2 |
11.5 |
400/900 |
3000 |
0.537 |
0.256 |
|||
CBT-10.9/2.1 |
12 |
400/900 |
3000 |
0.665 |
0.13 |
|||
CBT-10.9/3.0 |
12.5 |
400/900 |
3000 |
0.665 |
0.183 |
|||
CBT-10.9/3.6 |
13 |
400/900 |
3000 |
0.665 |
0.220 |
|||
CBT-10.9/4.2 |
13.5 |
400/900 |
3000 |
0.665 |
0.256 |
|||
CBT-13.0/4.2 |
16 |
400/900 |
3000 |
0.793 |
0.265 |
CBT-15.2/7.6 |
22 |
400/900 |
3000 |
0.93 |
0.465 |
3600 |
NPTF 1 G1 |
NPTF3/4 G3/4 |
CBT-22.9/7.6 |
28 |
400/900 |
3000 |
1.395 |
0.465 |
Product detail pictures:
Related Product Guide:
2012 Star Raider SCL First Ride Review | Monoblock Control Valve On Tractor
Wide Selection of Waste Bins, Storage Tipping Bins and Bin Tippers from Materials Handling | Komatsu Hydraulic Gear Pump
Our firm aims to operating faithfully, serving to all of our shoppers , and working in new technology and new machine consistently for Top Suppliers Hydraulic Parts 127v Power Unit - Hydraulic gear pump-HILO PUMP – Guorui, The product will supply to all over the world, such as: Munich, Argentina, Victoria, We are committed to meet all your needs and solve any technical problems you may encounter with your industrial components. Our exceptional products and vast knowledge of technology makes us the preferred choice for our customers.
By Barbara from Nicaragua - 2016.12.19 11:10
This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
By Christine from Barbados - 2016.03.08 14:45